Location:

British Columbia, Canada

Client:

Canadian Projects Limited, CHD

Year

2008-2010

Delivered products

The 19 MW Bone Creek hydroelectric project is located 90 km south of Valemount, B.C., near the town of Blue River.

TypeAdditional descriptionWidth (m)Height (m)Capacity (tons)Qty
Fixed wheel (Roller) gate Intake gate 3 3 3.8 1
Fixed wheel (Roller) gate Sluice gate + slide gate 3 3 5 1
Slide gate Draft tube gate 2.2 1.7 1.495 2
Slide gate Minium release gate 3
Hydraulic cylinders Intake & Sluice
HPU 3
Chain hoist Monorail hoist - Draft tube gate 3 1

Services

Site Supervision