Buckingham, QC
Boralex
2018
Buckingham hydroelectric station has a capacity of 10MW and is located on Rivière au Lièvre, in Outaouais.
Type | Additional description | Width (m) | Height (m) | Capacity (tons) | Qty |
---|---|---|---|---|---|
Fixed wheel (roller) gate | 6.6 | 5.7 | 2 | ||
Trash rack | 1 |
Copyright 2024 © - Mecan Hydro - All rights reserved.
Website powered by PowerSurfer Solutions