British Columbia, Canada
Ledcor, Innergex
2008-2009
The Fitzsimmons Creek Hydroelectric Project is a run-of-river power generating facility located on Fitzsimmons Creek, between Whistler and Blackcomb Mountains in Whistler, British Columbia. The installed capacity is 7.5 MW.
Type | Additional description | Width (m) | Height (m) | Capacity (tons) | Qty |
---|---|---|---|---|---|
Slide gate | Intake gate | 1.981 | 1.981 | 0.46 | 1 |
Slide gate | Sluice gate | 1.016 | 1.016 | 1 | |
Slide gate | Sluice gate | 0.5 | 0.5 | 1 | |
Hydraulic cylinders | Intake gate | ||||
HPU | Intake gate | ||||
Screw stem actuator |
Copyright 2024 © - Mecan Hydro - All rights reserved.
Website powered by PowerSurfer Solutions