Location:

Ontario, Canada

Client:

Construction Demathieu & Bard (CDB) inc., Hydromega

Year

2010-2013

Delivered products

The hydroelectric complex of Kapuskasing regroups 4 hydroelectric station of 5,5MW each. All of them are located on the Kapuskasing river in the North of Ontario.

TypeAdditional descriptionWidth (m)Height (m)Capacity (tons)Qty
Fixed wheel (Roller) gate Draft tube gate 5.908 4.256 11.901 8
Bulkhead (Stop log) Intake gate 4.35 4.848 6.877 4
Bulkhead (Stop log) Intake gate 4.35 4.848 5.904 2
Hydraulic cylinders
Slide gate Spillway gate 1.524 1.639 0.41 2
Screw stem actuator
Slide gate Spillway gate 3 1.8 3.2 2
Wire rope hoist 7 2
Hoist support structure
Fine Trash rack Galvanized steel 5.8 8.086 2
Control panels

Services

Installation and site supervision by M2i