Ontario, Canada
Construction Demathieu & Bard (CDB) inc., Hydromega
2010-2013
The hydroelectric complex of Kapuskasing regroups 4 hydroelectric station of 5,5MW each. All of them are located on the Kapuskasing river in the North of Ontario.
Type | Additional description | Width (m) | Height (m) | Capacity (tons) | Qty |
---|---|---|---|---|---|
Fixed wheel (Roller) gate | Draft tube gate | 5.908 | 4.256 | 11.901 | 8 |
Bulkhead (Stop log) | Intake gate | 4.35 | 4.848 | 6.877 | 4 |
Bulkhead (Stop log) | Intake gate | 4.35 | 4.848 | 5.904 | 2 |
Hydraulic cylinders | |||||
Slide gate | Spillway gate | 1.524 | 1.639 | 0.41 | 2 |
Screw stem actuator | |||||
Slide gate | Spillway gate | 3 | 1.8 | 3.2 | 2 |
Wire rope hoist | 7 | 2 | |||
Hoist support structure | |||||
Fine Trash rack | Galvanized steel | 5.8 | 8.086 | 2 | |
Control panels |
Copyright 2025 © - Mecan Hydro - All rights reserved.
Website powered by PowerSurfer Solutions