Location:

Powell River/British Columbia

Client:

Alterra Power

Year

2014

Delivered products

With a capacity of 62MW, the Jimmie Creek run-of-river hydroelectric power generating plant is located in the Toba Valley, north of Vancouver, British Columbia.  The plant is located on Jimmie Creek, a tributary of the Toba River.

TypeAdditional descriptionWidth (m)Height (m)Capacity (tons)Qty
Fixed wheel (Roller) gate Intake gate 3,300 3,200 1
Fixed wheel (Roller) gate Sluice gate 3,900 4,200 1
Bulkhead (Stop logs) Intake stoplogs 5,700 1,600 9
Bulkhead (Stop logs) Sluice stoplogs 3,900 2,500 3
Slide gate Draft tube gate 3,800 2,400 1
HPU & control panels Intake and sluice gate 1
Hydraulic cylinders Intake and sluice gate 2
Fine trash rack Thermoplastic 2,500 8,200 2
Coarse trash rack Galvanized steel 5,700 1,200 6
Trash rake Hydraulic 1

Services

Site supervision by M2i