Location:

British Columbia, Canada

Client:

Peter Kiewit Sons, Cloudworks

Year

2007-2008

Delivered products

The Kwalsa and Upper Stave Hydroelectric project includes six hydroelectric facilities with a total installed capacity of 150 MW. Those facilities are located in British Columbia.

TypeAdditional descriptionWidth (m)Height (m)Capacity (tons)Qty
Fixed wheel gate Intake gate 3 3 4.4 5
Slide gate Sluice gate 1.8 1.2 0.41 10
Slide gate IFC gates 0.508 0.508 5
Screw stem actuator

Services

Site supervision by M2i