British Columbia, Canada
Hydromax Energy
2006-2008
Clowhom facility consists of two run-of-river hydroelectric stations. They are located on Clowhom River, 60km north of Vancouver. Clowhom facility has a total capacity of 22MW.
Type | Additional description | Width (m) | Height (m) | Capacity (tons) | Qty |
---|---|---|---|---|---|
Fixed wheel (Roller) gate | Intake gate | 3 | 3 | 3.32 | 1 |
Fixed wheel (Roller) gate | Intake gate | 2.5 | 2.5 | 2.35 | 1 |
Fixed wheel (Roller) gate | Sluice gate | 3 | 3 | 3.32 | 1 |
Slide gate | Sluice gate | 1.676 | 1.676 | 0.53 | 2 |
Slide gate | Draft tube gate | 3.2 | 2.5 | 2.75 | 3 |
Slide gate | Minimum release gate | 0.915 | 0.915 | 1 | |
Slide gate | Minimum release gate | 0.762 | 0.762 | 1 | |
Hydraulic cylinders | 1 | ||||
HPU & control panel | 1 |
Copyright 2024 © - Mecan Hydro - All rights reserved.
Website powered by PowerSurfer Solutions