Location:

Cochrane, Ontario

Client:

Ontario Power Generation

Year:

2015

About this projet

TypeAdditional descriptionWidth (m)Height (m)Capacity (tons)Qty
Fixed wheel (Roller) gate Intake gate 4,4 4,2 1
Fixed wheel (Roller) gate Spillway gate 5,8 7,6 2
Slide gate Draft tube gate 4,4 4,3 2
Slide gate IFR gate 1,4 1,4 1
Coarse Trash rack Intake trashrack 8,8 2,3 3
Coarse Trash rack IFR trashrack 1,6 1,7 1
Bulkhead (Stop logs) Intake stoplogs 4,4 1,8 4
Bulkhead (Stop logs) Spillway stoplogs 5,7 2,1 3
Follower beam (Lifting beam) Intake stoplogs follower beam 3,75 1
Follower beam (Lifting beam) Spillway stoplogs follower beam 7,5 1
Follower beam (Lifting beam) Intake trashracks 9,0 1
Wire rope hoist Intake gate hoist 14,6 1
Wire rope hoist Spillway gates hoists 26,8 2
Chain hoist Spillway stoplogs monorail 6 1
Hoist support structure Spillway hoist structure and housing 27 12 1

Delivered product

Services

Installation and site supervision by M2i

The challenge:

Hydropower