Ontario, Canada
OPG
2018
Sir Adam Beck hydroelectric generating stations are two hydroelectric stations located in Niagara Falls, Ontario. The complex has a total generating capacity of 1997MW.
Type | Additional description | Width (m) | Height (m) | Capacity (tons) | Qty |
---|---|---|---|---|---|
Bulkhead (stoplogs) | 3.9624 | 3.9624 | 3 |
Copyright 2024 © - Mecan Hydro - All rights reserved.
Website powered by PowerSurfer Solutions