Nipigon – Pine Portage

Thunder Bay District, Ontario

New  •  

Hydro & Dams

Pine Portage GS is a 132 MW, four-unit hydro station on the Nipigon River. Built between 1950–1954, the 945 m-long dam includes sluices, gate sections, and a log chute. The site is vehicle-accessible, with power service available. The log lifter is accessible via the dam’s west end.

Share

Owner

Ontario Generation Power (OPG)

Year

2020

Location

Thunder Bay District, Ontario

Type of work

Engineering, Manufacturing, Installation, Site Supervision

SCOPE OF SUPPLY

The work includes the supply, delivery, and installation of all necessary materials, equipment, tools, methods, labour, and supervision to perform complete log lifter replacements at Cameron Falls GS, Pine Portage GS, Summit Control Dam, and Waboose Control Dam, in accordance with the provided specifications, procedures, and drawings.

Project photos

Related product(S)

Leave us a message

Use the contact form below to leave us a message. We will get back to you shortly.

PROJECT ADDED TO YOUR FAVORITES