The work includes the supply, delivery, and installation of all necessary materials, equipment, tools, methods, labour, and supervision to perform complete log lifter replacements at Cameron Falls GS, Pine Portage GS, Summit Control Dam, and Waboose Control Dam, in accordance with the provided specifications, procedures, and drawings.
The work includes the supply, delivery, and installation of all necessary materials, equipment, tools, methods, labour, and supervision to perform complete log lifter replacements at Cameron Falls GS, Pine Portage GS, Summit Control Dam, and Waboose Control Dam, in accordance with the provided specifications, procedures, and drawings.
