Sir Adam Beck (2018)

Niagara Falls, Ontario

New  •  

Hydro & Dams

The Sir Adam Beck II Generating Station sits on the Niagara River in Niagara Falls, Ontario, and has been in operation since 1954. With 16 units, the station reaches a maximum generating capacity of 1,499 MW. Together with the 10-unit Sir Adam Beck I station, it draws water from the Niagara and Welland Rivers above the falls, channeling it back into the lower Niagara River.

Share

Owner

OPG

Year

2018

Location

Niagara Falls, Ontario

Type of work

Engineering, Manufacturing & Site Supervision

SCOPE OF SUPPLY

Related product(S)