Tusket spillway gates

Argyle, Nova Scotia

New  •  

Hydro & Dams

Mecan-Hydro designed, manufactured and installed the Tusket spillway gates for Nova Scotia Power Inc in 2017. The Tusket Main Dam, a hydroelectric and water control infrastructure project on the Tusket River in Yarmouth County, Nova Scotia, is operated by Nova Scotia Power. Mecan-Hydro’s supply covered the fixed wheel (roller) gates, stoplogs, heated embedded parts and a follower beam for stoplog handling.

Share

Owner

Nova Scotia Power Inc.

Year

2017

Location

Argyle, Nova Scotia

Type of work

Engineering, Manufacturing, Site Supervision & Installation

SCOPE OF SUPPLY

The Tusket spillway gates are vertical lift steel gates of the fixed wheel (roller) type, designed by Mecan-Hydro for this project. A set of stoplogs completes the installation. Heated embedded parts with primary anchors are provided for the spillway gates, and embedded parts with primary anchors are provided for the stoplogs.

A follower beam designed and fabricated by Mecan-Hydro handles the stoplogs at Tusket.

Project photos

Related product(S)

There is no products related to this project.