Design, fabrication, delivery, documentation, and on-site support for a movable floating bulkhead for the Piney Project in Pennsylvania — from sealed drawings through commissioning, including initial installation and removal.
The Piney Hydroelectric Project is situated on the Clarion River in Clarion County, Pennsylvania. The facility comprises a 16-mile impoundment, a concrete gravity-arch dam reaching a maximum height of 139 feet, intake structures, and a powerhouse equipped with three vertical Francis turbine-generator units. The project was constructed in 1924 and is located approximately 3 miles southwest of the town of Clarion.
Brookfield
2013
Clarion, Pennsylvania
Engineering, Manufacturing & Site supervision
Design, fabrication, delivery, documentation, and on-site support for a movable floating bulkhead for the Piney Project in Pennsylvania — from sealed drawings through commissioning, including initial installation and removal.