Location:

Ontario, Canada

Client:

OPG

Year

2018

Delivered products

Sir Adam Beck hydroelectric generating stations are two hydroelectric stations located in Niagara Falls, Ontario. The complex has a total generating capacity of 1997MW.

Type Additional description Width (m) Height (m) Capacity (tons) Qty
Bulkhead (stoplogs) 3.9624 3.9624 3

Services

Site supervision by M2i