Jimmie Creek

Powell River, British Colombia

New  •  

Hydro & Dams

With a capacity of 62MW, the Jimmie Creek run-of-river hydroelectric power generating plant is located in the Toba Valley, north of Vancouver, British Columbia.  The plant is located on Jimmie Creek, a tributary of the Toba River.

Share

Owner

Alterra Power

Year

2014

Location

Powell River, British Colombia

Type of work

Engineering, Manufacturing & Site Supervision

SCOPE OF SUPPLY

The scope of work includes the design, supply, fabrication, shop assembly and testing, shipment, supervision of installation, field testing and commissioning, engineering documents, operation and maintenance manuals, on-site training, and warranty for the Intake Gate, Sluice Gate, and their associated stop logs.

This scope covers the complete lifecycle of the hydraulic and lifting equipment for the Intake and Sluice Gates. From design and fabrication through to on-site commissioning. It includes full engineering support, documentation, training, and warranty coverage, ensuring the equipment is ready to perform reliably from day one.

This scope covers the complete lifecycle of the trash rack systems. From design and fabrication through to on-site commissioning. It includes full engineering support, documentation, training, and warranty coverage, ensuring the equipment is ready to perform reliably from day one.

From design and fabrication through to on-site commissioning, this product is backed by full engineering support, documentation, training, and warranty coverage. Built to keep the fine trash rack cleaning system performing reliably from day one.

From design and fabrication through to on-site commissioning, the trash rake structures on the concrete bridge are backed by full engineering support, documentation, training, and warranty coverage. Built to ensure reliable performance from day one.

Project photos

Related product(S)