Quebec, Canada
Hydro-Québec
1999
The Bell Falls hydroelectric station is located on the Red river in Grenville, it has a 10MW capacity.
Type | Additional description | Width (m) | Height (m) | Capacity (tons) | Qty |
---|---|---|---|---|---|
Fixed wheel (Roller) gate | Intake gate | 5.060 | 6.865 | 24 | 1 |
Bulkhead (Stop log) | Intake gate | 1.352 | 4.6 | 1 | |
Bulkhead (Stop log) | Bypass | ||||
Fine Trash Rack | Galvanized steel | ||||
Trash rake cleaner |
Copyright 2024 © - Mecan Hydro - All rights reserved.
Website powered by PowerSurfer Solutions